Hi Guys,
Is there a way that I can align my project grid against the linked model grid?
is just that I don’t want to align my grid manually every time I receive a revise
grid model from the Arch.
Thanks
Hi Guys,
Is there a way that I can align my project grid against the linked model grid?
is just that I don’t want to align my grid manually every time I receive a revise
grid model from the Arch.
Thanks