Hello everyone,
I hope you’re doing well. I am currently working with Climate Studio and Wallacei, but I’m encountering an issue when trying to link the two. Specifically, when Wallacei produces iterations, they do not trigger the electric lighting simulation in Climate Studio.
To work around this, I created two separate documents: one for Wallacei and the other for Climate Studio. I connected them using data input and output, which allows me to trigger the simulations in Climate Studio. However, Wallacei continues to produce iterations before Climate Studio has finished one simulation, resulting in a slow workflow.
To address this, I need a way to slow down Wallacei’s production of iterations so that it aligns better with the speed of Climate Studio’s simulations. Does anyone have suggestions or solutions for how to optimize the workflow between these two?
Any help or advice would be greatly appreciated!
Thank you in advance!