may i know what is better way to input data in schedule?
if we can edit the schedule , i think even direct shape can be accepted by clients.
or what is better method for these different elevation . curved shape to revit , we at least can generate the schedule in area, volume, material
thanks in advance
Brad
Not smart way I think is to divide them in many profile curvesssssss depend on how the tolerance you accept so we can use add wall in profile that component
The direct shape is the way to go in with geometry like this. It will be categorized as a wall and scheduled as such, but will lack the system parameters such as volume. Creating your own Wall Schedulable Parameters will be applicable to both (in the volume example you would fill out the parameters using Rhino Volume data as well as the existing System Walls.