Rhino 8.0 forced upgrade?

Since the release of Rhino 8.0 was my Rhino 7 evaluation version forced to upgrade without the trial period ending yet?

My trial was August 12th - November 10th, so did Rhino 8.0 come out sometime in between?

The V7 evaluation period has nothing to do with Rhino V8; installing V8 will not “expire” an unexpired V7 evaluation version. Your V7 should have expired normally on 10 November.

You cannot get a second evaluation period for any version. However, if you have not already done so, you may download and install the V8 evaluation version, which will be valid from 90 days from the time you downloaded it.