Ah good, that’s what I was hoping was the case. I was surprised that the branches weren’t maintained through the other operations.
The lines are from an openfoam case in butterfly and then run through vector smoothing loosely based on this post: Wind Flow Map to vectors or curves
I now realize you were also in that thread. It is super promising for stuff that isn’t supposed to be hyper accurate but more visually compelling.