If I set type of a wall layer to core and structure, VA removes overlapped lines between structure and finish, and structure gets priority in draw order accordingly. Slabs does not offer such options, which makes it impossible to have structure drawn on top of finish.
Structure should always get priority over to finish in draw order. I wish future version makes it possible to set draw order in slabs as well.
Thanks.