How do I manage that only a part is executed?
For example, I have 10 points that I want to connect with a polyline.
But now I decide to use only 20% or 50% of the points.
Is that possible?
How do I manage that only a part is executed?
For example, I have 10 points that I want to connect with a polyline.
But now I decide to use only 20% or 50% of the points.
Is that possible?
PointsSubList.gh (6.7 KB)
Can it be that you need a plug-in?
Thanks