How can I add a cost parametre in the table?

Hello there
Just wondering how I can add a column with the cost of the walls in the schedual table? I’ve found in the style that I can add property field and parameters but even when the cost column has bee added to my table, I ca’nt fin a way to get the cost calculated (like the m2. the length, etc)

Thank you

Hi @marchermitte,

Currently there is not possible to have “calculated” parameters using a formula. This feature is planned for VisualARQ 3.

Enric