We are hiring one computational designer and have built a challenge instead of asking for a CV.
The problem is a CLT floor system. Two standard panel widths.
a structural joint rule. six envelopes that don’t all cooperate.
before you open Grasshopper, what do you parameterize?
what do you ask the structural engineer before you write a single node?
Halfway through, a fabrication constraint arrives, and two joint locations are dead.
one seat. palo alto.
Salary + ESOP. Full compensation details shared over email.